The first steel tower transmission line, between Homebush and Tallawarra, in NSW, was built in 1951 by Electric Power Transmission Pty Ltd (EPT), a subsidiary of the Italian multinational Societé Anonima Elettrificazione SpA (SAE), with steel imported from Italy and with Italian labour sent to Australia specifically to this purpose. Franco Belgiorno-Nettis and Carlo Salteri, then employed by SAE respectively in Milan and Bologna, were despatched to Sydney, on five year contracts to manage the project as a start.
Page Media: